You can now listen to Antigua News articles!

Google map footage of the road.
The Ministry of Works advises all motorists to proceed with caution along All Saints Road as a portion is closed off in the vacinity of Kennedy’s Hardware and Fadi’s Building Supplies.
Detour signs are in place and should be adhered to for your safety.
Upon inspection, it was found that a section of the road, under which a major waterway flows, is now undermined following heavy rains hence the road closure in an effort to maintain safety.
The Ministry is working expeditiously to reinstate the undermined section as soon as possible.
Preparations for the necessary overall reconstruction of All Saints Road are ongoing, with work expected to commence in the second half of 2025 as stated prior.
We appreciate your cooperation and understanding.
Any concerns can be forwarded to Tel# (268)468-4600.
Careful now.
We are in the heat of the sailing week event, and this is happening. Roads towards such an annual event should be checked in advance and before repairs. PWD needs a proper maintenance road repair schedule. Don’t wait until the middle of an annual event to clean and repair gutter drains and roads!
One of these days the road woes will be over. The next generation may see it.